Empirical evaluation of road rehabilitation projects on Aba–Owerri Road (A case study of Aba-Owerri Road)

dc.contributor.authorEbenuwa, John Ifeanyi
dc.date.accessioned2024-11-18T11:53:45Z
dc.date.available2024-11-18T11:53:45Z
dc.date.issued2023-08
dc.descriptionThe Master's thesis contains figures and tables
dc.description.abstractThe study examines the Empirical evaluation of Road Rehabilitation Projects (RRP) of Aba Owerri Road in Eastern part of Nigeria. The motivation for the study was due to deficiencies and inability of conventional Gantt chart scheduling techniques in addressing problems of time and cost overruns in road rehabilitation projects. Gantt chart failed to identify, isolate and exercise tight control on critical road rehabilitation activities that control the project duration. A total of four RRP identified to have suffered time overrun when scheduled and executed with Gantt chart were used for the study through experimental research design. The work breakdown structures of the RRP depicted in their respective Gantt charts were reschedule with an analytical tool of Critical Path Method (CPM). By inferential network analysis and results, the CPM easily displayed, effectively identified and isolated critical path activities which influenced and increased the project duration by seventeen months (15- 32) thus representing one hundred and thirteen percent (113%) upward review in project cost and time management. As part of effort to further confirm the results above, a more scientific approach was applied with the use of a micro software which also confirm the realistic project durations to be 32 months The conclusion is that it was obvious that work programme-chart (Gannt Chart) is reasonably effective only when applied to uncomplicated tasks, especially those involving a limited number of activity dependency, which means it cannot effectively handle the complexity inherent in most projects with a large number of activity. The study therefore recommends the adoption and institution of network scheduling technique (CPM) for scheduling of large scale RRP so as to complete the projects on schedule and contain cost and time overrun.
dc.description.sponsorshipDepartment of Project Management Technology, FUTO
dc.identifier.citationEbenuwa, J. I. (2023). Empirical evaluation of road rehabilitation projects on Aba–Owerri Road (A case study of Aba-Owerri Road)(Unpublished Master's Thesis). Federal University of Technology, Owerri, Nigeria
dc.identifier.urihttps://repository.futo.edu.ng/handle/20.500.14562/1507
dc.language.isoen
dc.publisherFederal University of Technology, Owerri
dc.rightsAttribution-NonCommercial-ShareAlike 4.0 Internationalen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/4.0/
dc.subjectNetwork scheduling techniques
dc.subjectroad rehabilitation project
dc.subjectGantt chart
dc.subjectcritical path method
dc.subjectcritical activities
dc.subjecttime overrun
dc.subjectexperimental research design
dc.subjectDepartment of Project Management Technology
dc.titleEmpirical evaluation of road rehabilitation projects on Aba–Owerri Road (A case study of Aba-Owerri Road)
dc.typeMaster’s Thesis

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Ebenuwa, J. I._Empirical_2023.pdf
Size:
2.95 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.64 KB
Format:
Item-specific license agreed to upon submission
Description:

Collections