Opara, Godswill Ngozi2025-02-042025-02-042023-10Opara, G. N. (2023). Analysis of the contributing factors to construction schedule overrun in selected public sector projects in Imo State (Unpublished Master's Thesis). Federal University of Technology, Owerri.https://repository.futo.edu.ng/handle/20.500.14562/1608The Master's Thesis contains tablesThis work seeks to analyze the Contributing Factors to Construction Schedule Overrun in Selected Public Sector Projects in Imo State. The objectives are to: determine and analyze the factors responsible for project schedule overrun in construction projects in Imo State; examine possible individual and collective significant effects of the factors on successful project delivery; examine the impact of schedule overrun on construction projects and; identify the causes of schedule overrun in construction projects and proffer workable solution to them. Questionnaire was developed using the 5-point Likert scale for the collection of primary data. Multiple regression analysis was adopted for the analysis of the collected data. The result obtained shows that government policies and project funding/finance, are significant factors that contribute to construction projects schedule overrun while project technology, force majeure and corruption are not significant. Funding/finance has the highest ranking, project technology ranks the least. Based on the above findings, it can be concluded that proper planning should be encouraged; government policies and programmes should be made in such a way that favours timely execution of projects. Adequate financial provisions should be made available to contractors by the government. The use of local raw materials should be encouraged in the execution of contracts. The selection of contractors and other major stakeholders should be based on competence and realistic tender quotations. All efforts should be made to reduce or eliminate the occurrence of design modifications during the project execution.enAttribution-NonCommercial-ShareAlike 4.0 InternationalProject scheduleconstruction projectspublic sectorfundingDepartment of Project management Technologyproject overrunAnalysis of the contributing factors to construction schedule overrun in selected public sector projects in Imo StateMaster’s Thesis